The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off


A computer system is analyzed considering the concept of priority to Preventive Maintenance (PM) over hardware repair subject to maximum operation and repair times. Two-identical units of the computer system have been taken up-one is initially operative and other is kept as spare in cold standby. In each unit, hardware (h/w) and software (s/w) work together and may fail independently from normal mode. There is a single server who visits the system immediately when needed to carry out repair activities. PM of the unit is conducted after a Maximum Operation Time (MOT). If repair of the h/w is not possible up to a maximum repair time, it is replaced by a new one with some replacement time. However, only replacement of the s/w is made giving some replacement time with the new one when s/w fails to execute the program properly. Priority to PM of the unit is given over h/w repair. The failure time of the unit follows negative exponential distribution while the distributions of PM, repair and replacements are taken as arbitrary. To carry out the cost-benefit analysis, expressions for several reliability measures are obtained by using semi-Markov and regenerative point technique. The graphical behaviour of some important performance measures of the system has been examined giving particular values to various parameters and costs.

Keywords

Computer System, H/w and S/w Failure, Priority, Maximum Operation And Repair Time, Preventive Maintenance and Cost-benefit Analysis
User