Objectives: To study the effectiveness and implementation of Jishu Hozen (JH) Pillar activity in achieving zero defects, zero accidents, zero breakdown and zero wastages. Methods/Statistical Analysis: A unique approach was adopted based on Action Research. A spiral of cycles involve planning, observing and analyzing. An Action Research team of organization’s personnel was specially formed to carry out the necessary experiments and analysis using the Jishu Hozen pillar of total productive maintenance. Findings: The Overall Equipment Effectiveness (OEE) of Alfing has increased over a period of 4 months. But still it has not reached up to World Class Goals i.e 85%. The actual production of the company is very less as compared to the planned production. As a result the performance rating of the machine is very low which affects the overall equipment effectiveness. So the company has to take some measures to increase their daily production as per the capacity of the machine and achieve their targets of planned production. The uniqueness about the study is that Jishu Hozen pillar is used in this study for studying overall effectiveness whereas the other papers reviewed had used all five pillars of Total Productive Maintenance (TPM). Application/Improvements: By implementing JH activity, the responsibility and belongingness of the employees is increased and the overall efficiency is increased by 85%.
User

  • Werner T, Weckenmann A. Sustainable quality assurance by assuring competence of employees, Measurement. 2012; 45(6):1534−39. https://doi.org/10.1016/j.measurement. 2012.02.025.
  • McKone K, Schroeder R, Cua K. The impact of total productive maintenance practices on manufacturing performance, Journal of Operations Management. 2001; 19(1):39−58. https://doi.org/10.1016/S0272-6963(00)00030-9.
  • Hansson J, Backlund F, Lycke L. Managing commitment: Increasing the odds for successful implementation of TQM, TPM or RCM, International Journal of Quality and Reliability Management. 2003; 20(9):993−1008. https://doi.org/10.1108/02656710310500815.
  • Parida A, Chattopadhyay G. Development of a multicriteria hierarchical framework for Maintenance Performance Measurement (MPM), Journal of Quality in Maintenance Engineering. 2007; 13(3):241−58. https://doi.org/10.1108/13552510710780276.
  • Pintelon L, Gelders L. Maintenance management decision making, European Journal of Operational Research. 1992; 58(3):301−17. https://doi.org/10.1016/0377-2217(92)90062-E.
  • Ahmed S, Hj. Hassan M, Taha Z. TPM can go beyond maintenance: Excerpt from a case implementation, Journal of Quality in Maintenance Engineering. 2005; 11(1):19−42. https://doi.org/10.1108/13552510510589352.
  • Telsang MT. Industrial Engineering and Production Management. 6th Edition. New Delhi: S Chand & Company; 2009.

Abstract Views: 212

PDF Views: 0




  • Total Productive Maintenance in a Manufacturing Industry:A Case Study of JISHU HOZEN Implementation

Abstract Views: 212  |  PDF Views: 0

Authors

Hemlata Vivek Gaikwad
Department of Management Studies, Rajarambapu Institute of Technology Islampur – 415414, Maharashtra, India

Abstract


Objectives: To study the effectiveness and implementation of Jishu Hozen (JH) Pillar activity in achieving zero defects, zero accidents, zero breakdown and zero wastages. Methods/Statistical Analysis: A unique approach was adopted based on Action Research. A spiral of cycles involve planning, observing and analyzing. An Action Research team of organization’s personnel was specially formed to carry out the necessary experiments and analysis using the Jishu Hozen pillar of total productive maintenance. Findings: The Overall Equipment Effectiveness (OEE) of Alfing has increased over a period of 4 months. But still it has not reached up to World Class Goals i.e 85%. The actual production of the company is very less as compared to the planned production. As a result the performance rating of the machine is very low which affects the overall equipment effectiveness. So the company has to take some measures to increase their daily production as per the capacity of the machine and achieve their targets of planned production. The uniqueness about the study is that Jishu Hozen pillar is used in this study for studying overall effectiveness whereas the other papers reviewed had used all five pillars of Total Productive Maintenance (TPM). Application/Improvements: By implementing JH activity, the responsibility and belongingness of the employees is increased and the overall efficiency is increased by 85%.