Business Process Re-Engineering of Engineering Procurement Construction (EPC) Project in Oil and Gas Industry in Indonesia


Affiliations
1 Department of Industrial Engineering, Faculty of Engineering, Universitas Indonesia, Indonesia
 

Objectives: To reduce time delays of Engineering Procurement Construction(EPC) projects in the oil and gas industry. Methods: This study used Business Process Re-engineering (BPR) methodology applied in project management. The methodology used starting Prepare for Engineering, Map and Analyze As-Is Process, Design To-Be Process, Re-engineered Process and Improve Continously. Findings:This study resulted an improved project planning using business process re-engineering method with time on engineering phase is reduced up to 55% and the procurement phase with an efficiency up to 35%. Application/Improvements:BPR method should be used in evaluating the delay in project work.

Keywords

Business Process Re-engineering, Information System, Oil and Gas, Operation Management, Project Management
User

Abstract Views: 176

PDF Views: 0




  • Business Process Re-Engineering of Engineering Procurement Construction (EPC) Project in Oil and Gas Industry in Indonesia

Abstract Views: 176  |  PDF Views: 0

Authors

M. Dachyar
Department of Industrial Engineering, Faculty of Engineering, Universitas Indonesia, Indonesia
Z. A. H. Sanjiwo
Department of Industrial Engineering, Faculty of Engineering, Universitas Indonesia, Indonesia

Abstract


Objectives: To reduce time delays of Engineering Procurement Construction(EPC) projects in the oil and gas industry. Methods: This study used Business Process Re-engineering (BPR) methodology applied in project management. The methodology used starting Prepare for Engineering, Map and Analyze As-Is Process, Design To-Be Process, Re-engineered Process and Improve Continously. Findings:This study resulted an improved project planning using business process re-engineering method with time on engineering phase is reduced up to 55% and the procurement phase with an efficiency up to 35%. Application/Improvements:BPR method should be used in evaluating the delay in project work.

Keywords


Business Process Re-engineering, Information System, Oil and Gas, Operation Management, Project Management



DOI: https://doi.org/10.17485/ijst%2F2018%2Fv11i9%2F170819