The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off


Objectives: Long-term roadmaps for facilitating BIM will be developed pertaining to Korea and other countries. The current status and the time frame for BIM adoption will be analyzed, especially in Korea. Methods/Statistical Analysis: BIM can be utilized in the practices and business area in many building construction projects. In order to analyze the current status and future trend of BIM in Korea, survey and expert interview techniques are used in this study. Major technologies which could be used with BIM are identified, and when these technologies could be fully adopted in each area is asked in the survey and interview. Findings: BIM has limitations for practical application in Korea. However, it is an essential technology for efficiency improvement in building construction projects. In order to maximize the efficiency of BIM, it is required to go with ICT convergence technologies. In this study, ICT convergence technologies which can be used with BIM are identified, and the approximate time in which applied BIM technologies could be available is surveyed. For example, according to the survey, applied BIM technologies in the Design and Engineering phase could be widely adopted in 5 to 10 years, and BIM in the construction and facility management phase could be adopted in 10 to 20 years. Improvements/Applications: The applied BIM technologies and the time frame which they could be available in the future were identified and surveyed in this study. It will be useful for those who are preparing a BIM application strategy and are planning for their future.

Keywords

Building Information Modeling (BIM), Information and Communications Technologies (ICT), Lifecycle, Process.
User