Open Access Open Access  Restricted Access Subscription Access
Open Access Open Access Open Access  Restricted Access Restricted Access Subscription Access

Economics of Teak Plantation in Uttarakhand


     

   Subscribe/Renew Journal


20-45 years old teak, rain-fed, plantations carried out on forest land in gaps of original sal forests, that received frost protection by the nursing effect of sal over-wood were analysed for financial viability in tarai region of Uttarakhand. The maximum NPV (Rs. 19,856) at 12 % discount rate and IRR (31.20%) was obtained in 21 years old Barakoli plantation. It was due to higher survival rate (43.85 %) and the lowest gestation period (21 years). On the other hand minimum IRR 23.95 % was found in case of Lakhanmandi plantation site. It was because of the poor survival rate (23.65 %) and a long gestation period of 45 years. In general all the unirrigated teak plantations on government land (NPV at 12 % rate of interest, Rs. 3,556 to Rs. 19,856 and IRR 23.95 to 31.20 per cent) were found financially viable.
Font Size

User
About The Authors

M. Y. Ansari

H. P. Singh


Subscription Login to verify subscription
Notifications

Abstract Views: 370

PDF Views: 2




  • Economics of Teak Plantation in Uttarakhand

Abstract Views: 370  |  PDF Views: 2

Authors

Abstract


20-45 years old teak, rain-fed, plantations carried out on forest land in gaps of original sal forests, that received frost protection by the nursing effect of sal over-wood were analysed for financial viability in tarai region of Uttarakhand. The maximum NPV (Rs. 19,856) at 12 % discount rate and IRR (31.20%) was obtained in 21 years old Barakoli plantation. It was due to higher survival rate (43.85 %) and the lowest gestation period (21 years). On the other hand minimum IRR 23.95 % was found in case of Lakhanmandi plantation site. It was because of the poor survival rate (23.65 %) and a long gestation period of 45 years. In general all the unirrigated teak plantations on government land (NPV at 12 % rate of interest, Rs. 3,556 to Rs. 19,856 and IRR 23.95 to 31.20 per cent) were found financially viable.