Abstract Views :150 |
PDF Views:0
Authors
Affiliations
1 Department of Mechanical Engineering, Kumaraguru College of Technology, Coimbatore - 641 006, IN
2 Department of Mechanical Engineering, Coimbatore Institute of Technology, Coimbatore - 641 014, IN
Source
Manufacturing Technology Today, Vol 5, No 1 (2006), Pagination: 12-15
Abstract
Optimization of parallel machine scheduling in a shop floor environment is considered with the objectives of minimizing both the total earliness and the total tardiness. A hybrid optimization procedure based on genetic algorithm and fuzzy logic technique has been developed in this work in order to achieve the multi-objective functions. The proposed optimization procedure is compared with the existing heuristics and the performances are analyzed.