Open Access Open Access  Restricted Access Subscription Access
Open Access Open Access Open Access  Restricted Access Restricted Access Subscription Access

Construction of Buildings by Volumetric Space Blocks


Affiliations
1 Bihar Institute of Technology, Sindri, India
     

   Subscribe/Renew Journal


There is huge shortage of houses in the whole world and the demand cannot be fulfilled by conventional construction method. 1.1 to 1.4 labour days are required for the construction of one cubic meter of brick houses where as if the construction is done by large blocks only 0.6 to 0.7 labour day is necessary. If the construction is done by large panels, then the labour days required is only 0.45 to 0.50.
User
Subscription Login to verify subscription
Notifications
Font Size

Abstract Views: 155

PDF Views: 0




  • Construction of Buildings by Volumetric Space Blocks

Abstract Views: 155  |  PDF Views: 0

Authors

Janardan Jha
Bihar Institute of Technology, Sindri, India

Abstract


There is huge shortage of houses in the whole world and the demand cannot be fulfilled by conventional construction method. 1.1 to 1.4 labour days are required for the construction of one cubic meter of brick houses where as if the construction is done by large blocks only 0.6 to 0.7 labour day is necessary. If the construction is done by large panels, then the labour days required is only 0.45 to 0.50.