Open Access Open Access  Restricted Access Subscription Access

Systematic Layout Planning and Balancing of Engine Production Processes for After Test and After Paint Assembly Lines


Affiliations
1 School of Mech. Engg., VIT University, Vellore, India
 

   Subscribe/Renew Journal


This paper is aimed at reducing the costs, maintaining the quality and designing the plant layout that is flexible to meet the customer demand. A number of stations in the after test assembly and after paint assembly are selected for capturing the production process requirements. Then, failure mode and effects analysis of after test assembly is carried out. Layout designs for the after test assembly and after paint assembly are developed using systematic layout planning and are validated using Spaghetti diagrams. With the improved layout, considerable reduction in the distance moved by the operator has resulted in 20% cost saving at 80% Takt time.

Keywords

Systematic Layout Planning, Assembly Line Design, After Test Assembly, After Paint Assembly, Spaghetti Diagram.
User
Subscription Login to verify subscription
Notifications
Font Size

Abstract Views: 242

PDF Views: 160




  • Systematic Layout Planning and Balancing of Engine Production Processes for After Test and After Paint Assembly Lines

Abstract Views: 242  |  PDF Views: 160

Authors

R. Durga Prasad
School of Mech. Engg., VIT University, Vellore, India
K. Vishwa Kumar
School of Mech. Engg., VIT University, Vellore, India
P. A. Jeeva
School of Mech. Engg., VIT University, Vellore, India

Abstract


This paper is aimed at reducing the costs, maintaining the quality and designing the plant layout that is flexible to meet the customer demand. A number of stations in the after test assembly and after paint assembly are selected for capturing the production process requirements. Then, failure mode and effects analysis of after test assembly is carried out. Layout designs for the after test assembly and after paint assembly are developed using systematic layout planning and are validated using Spaghetti diagrams. With the improved layout, considerable reduction in the distance moved by the operator has resulted in 20% cost saving at 80% Takt time.

Keywords


Systematic Layout Planning, Assembly Line Design, After Test Assembly, After Paint Assembly, Spaghetti Diagram.



DOI: https://doi.org/10.4273/ijvss.8.1.08