Open Access Open Access  Restricted Access Subscription Access

Three Stage Scheduling of Steel Making Using Earliest Deadline First Algorithm


Affiliations
1 IT Department, Visakhapatnam Steel Plant, RINL, A.P, India
2 Department of CS, Andhra Univrsity, Vizag, A.P, India
3 Department of CSE, Adikavi Nannaya University, A.P, India
4 Department of Metallurgy, Andhra University, A.P, India
 

In this paper the authors have ventured into scheduling of Steel Making process from LD converters to Continuous casters including Argon Rinsing stations using Earliest Dead line First (EDF) scheduling algorithms. The authors have evaluated performance metrics of the model like Turnaround time, Average waiting time and Total dead line deviation. The results of EDF scheduling is compared with First Cum First Scheduling (FCFS), Shortest Job First(SF) scheduling and the results of EDF scheduling has shown better performance over the other two.

Keywords

EDF, Steel Making, Three Stage Scheduling.
User
Notifications
Font Size

Abstract Views: 173

PDF Views: 0




  • Three Stage Scheduling of Steel Making Using Earliest Deadline First Algorithm

Abstract Views: 173  |  PDF Views: 0

Authors

P. Chandra Sekhar
IT Department, Visakhapatnam Steel Plant, RINL, A.P, India
P. S. Avadhani
Department of CS, Andhra Univrsity, Vizag, A.P, India
P. Suresh Varma
Department of CSE, Adikavi Nannaya University, A.P, India
N. R. M. R. Bhargava
Department of Metallurgy, Andhra University, A.P, India

Abstract


In this paper the authors have ventured into scheduling of Steel Making process from LD converters to Continuous casters including Argon Rinsing stations using Earliest Dead line First (EDF) scheduling algorithms. The authors have evaluated performance metrics of the model like Turnaround time, Average waiting time and Total dead line deviation. The results of EDF scheduling is compared with First Cum First Scheduling (FCFS), Shortest Job First(SF) scheduling and the results of EDF scheduling has shown better performance over the other two.

Keywords


EDF, Steel Making, Three Stage Scheduling.