Nuclear Power Plant Construction Scheduling Problem with Time Restrictions: A Particle Swarm Optimization Approach


Affiliations
1 Department of Computer Science and Information Engineering, Yuanpei University of Medical Technology, Hsinchu 23568, Taiwan, Province of China
2 Department of Computer Science and Information Engineering, Hwa Hsia University of Technology, No. 111, Gong Jhuan Road, Chung Ho, Taipei 23568, Taiwan, Province of China
3 Department of Applied Mathematics, Chinese Culture University, No. 55, Hwa-Kang Road, Yang-Ming-Shan, Taipei 11114, Taiwan, Province of China
 

In nuclear power plant construction scheduling, a project is generally defined by its dependent preparation time, the time required for construction, and its reactor installation time. The issues of multiple construction teams and multiple reactor installation teams are considered. In this paper, a hierarchical particle swarm optimization algorithm is proposed to solve the nuclear power plant construction scheduling problem and minimize the occurrence of projects failing to achieve deliverables within applicable due times and deadlines.

Keywords

English
User
Notifications
Font Size

Abstract Views: 98

PDF Views: 0




  • Nuclear Power Plant Construction Scheduling Problem with Time Restrictions: A Particle Swarm Optimization Approach

Abstract Views: 98  |  PDF Views: 0

Authors

Shang-Kuan Chen
Department of Computer Science and Information Engineering, Yuanpei University of Medical Technology, Hsinchu 23568, Taiwan, Province of China
Yen-Wu Ti
Department of Computer Science and Information Engineering, Hwa Hsia University of Technology, No. 111, Gong Jhuan Road, Chung Ho, Taipei 23568, Taiwan, Province of China
Kuo-Yu Tsai
Department of Applied Mathematics, Chinese Culture University, No. 55, Hwa-Kang Road, Yang-Ming-Shan, Taipei 11114, Taiwan, Province of China

Abstract


In nuclear power plant construction scheduling, a project is generally defined by its dependent preparation time, the time required for construction, and its reactor installation time. The issues of multiple construction teams and multiple reactor installation teams are considered. In this paper, a hierarchical particle swarm optimization algorithm is proposed to solve the nuclear power plant construction scheduling problem and minimize the occurrence of projects failing to achieve deliverables within applicable due times and deadlines.