Open Access Open Access  Restricted Access Subscription Access
Open Access Open Access Open Access  Restricted Access Restricted Access Subscription Access

Evaluation of Performance Indicators for Canal Command Area of Samrat Ashok Sagar Project Vidisha District M.P.


Affiliations
1 Department of Soil and Water Engineering, Jawaharlal Nehru Krishi Vishwa Vidyalaya, Jabalpur (M.P.), India
     

   Subscribe/Renew Journal


The existing irrigation system of right bank canal including the canal water distribution, irrigation supplied, crop yield, water used and water productivity was evaluated on the basis on Nelson’s parameters. These indicators was found as Tail end supply ratio:0.71, delivery timeliness ratio: 0.75 carrying capacity ratio: 0.79 and fee collection performance: 0.35 for Canal Command Area of Samrat Ashok Sagar Project Vidisha district M.P. Tail end ratio value 0.71 indicated that water supply in the head and tail was almost in satisfactory range. It was also observed that tail end water supply was sufficient for 80 days only out of 112 days of canal operation. Delivery timeliness ratio (0.75), carrying capacity ratio (0.79), poor structure ratio (0.00), fee collection (0.35), Manpower numbers ratio (0.003), sustainability of irrigated area ratio (1.16) and area infrastructure ratio (301.62) were calculated tail end supply ratio was not found within the preference range this indicates that amount water reaching to tail end is not satisfactory and requires proper planning. Similarly fee collection ratio was also found poor and needs improvement. The values of other water delivery indicators was found within reference range and hence, declared satisfactory.

Keywords

Performance Indicator, Canal Irrigation Performance, Water Management, Water Productivity, Water User Association.
Subscription Login to verify subscription
User
Notifications
Font Size


  • Anonymous (2016). Annual Report of Samrat Ashok Sagar Project, Irrigation department Vidisha Madhya Pradesh, pp.123.
  • Burton, M., Molden, D. and Skutsch, J. (2000). Benchmarking irrigation and drainage system performance.Position paper, IPTRID-FAOWORLDBANK, Working Group on Performance Indicators and Benchmarking, Report on a Workshop, 3-4 August, FAO, Rome, Italy.
  • Chouhan, S.S. (2009). Studies on irrigation performance in initial reach of Left Bank Canal network of Rani Avanti Bai Sagar Irrigation Project. M.Tech Thesis, Jawaharlal Nehru Krishi Vishwa Vidyalaya, Jabalpur, M.P. (India).
  • Molden, D.J., Sakthivadivel, R., Perry, C.J. and Fraiture, C. (1998). Indicators for comparing the performance of irrigated agricultural systems. IWMI Research Report No. 20.
  • Nelson, D.E. (2000). Performance indicator for irrigation canal command managers of water user association, 18th International Congress on Irrigation & Drainage, Montreal, 1(B):1-12.
  • Rodriguez-Diaz, J.A., Poyato, E.C., Lopez, L.R. and Perez-Urrestarazu, L. (2008). Benchmarking and multivariate data analysis techniques for improving the efficiency of irrigation districts: an application in Spain. Agric. Syst., 96: 250-259.

Abstract Views: 173

PDF Views: 0




  • Evaluation of Performance Indicators for Canal Command Area of Samrat Ashok Sagar Project Vidisha District M.P.

Abstract Views: 173  |  PDF Views: 0

Authors

Shiv Singh Basediya
Department of Soil and Water Engineering, Jawaharlal Nehru Krishi Vishwa Vidyalaya, Jabalpur (M.P.), India
S. K. Pyasi
Department of Soil and Water Engineering, Jawaharlal Nehru Krishi Vishwa Vidyalaya, Jabalpur (M.P.), India
R. N. Shrivastava
Department of Soil and Water Engineering, Jawaharlal Nehru Krishi Vishwa Vidyalaya, Jabalpur (M.P.), India

Abstract


The existing irrigation system of right bank canal including the canal water distribution, irrigation supplied, crop yield, water used and water productivity was evaluated on the basis on Nelson’s parameters. These indicators was found as Tail end supply ratio:0.71, delivery timeliness ratio: 0.75 carrying capacity ratio: 0.79 and fee collection performance: 0.35 for Canal Command Area of Samrat Ashok Sagar Project Vidisha district M.P. Tail end ratio value 0.71 indicated that water supply in the head and tail was almost in satisfactory range. It was also observed that tail end water supply was sufficient for 80 days only out of 112 days of canal operation. Delivery timeliness ratio (0.75), carrying capacity ratio (0.79), poor structure ratio (0.00), fee collection (0.35), Manpower numbers ratio (0.003), sustainability of irrigated area ratio (1.16) and area infrastructure ratio (301.62) were calculated tail end supply ratio was not found within the preference range this indicates that amount water reaching to tail end is not satisfactory and requires proper planning. Similarly fee collection ratio was also found poor and needs improvement. The values of other water delivery indicators was found within reference range and hence, declared satisfactory.

Keywords


Performance Indicator, Canal Irrigation Performance, Water Management, Water Productivity, Water User Association.

References